@ui-perf/critical-path-win32-ia32-msvc
A critical path assertion library powered by rust
Supply chain provenance
Status for the latest visible version.
Maintainers
Keywords
Accepted risks
Findings the reviewer chose to accept rather than block on.
| Source | Rule | Reason | Accepted by | When |
|---|---|---|---|---|
| npm-metadata | bundled-binaries | AI (npm-metadata): Platform-specific native .node binary is the intended artifact; SLSA provenance attestation confirms CI/CD build integrity. | ai | |
| bogus-package | bogus-package | AI (bogus-package): No-dep, sparse-README pattern is expected for a platform-specific binary shard package. | ai |
Versions (showing 5 of 5)
| Version | Deps | Published |
|---|---|---|
| 2.0.0 | 0 / 0 | |
| 1.2.1 | 0 / 0 | |
| 1.2.0 | 0 / 0 | |
| 1.1.5 | 0 / 0 | |
| 1.1.4 | 0 / 0 |
v2.0.0
1 findingPublished via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.
v1.2.1
1 findingPublished via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.
v1.2.0
2 findingsPackage contains compiled binaries that could be backdoors: • critical-path.win32-ia32-msvc.node
Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.
v1.1.5
2 findingsPackage contains compiled binaries that could be backdoors: • critical-path.win32-ia32-msvc.node
Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.
v1.1.4
2 findingsPackage contains compiled binaries that could be backdoors: • critical-path.win32-ia32-msvc.node
Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.