← Home

@ui-perf/critical-path-darwin-x64

A critical path assertion library powered by rust

5
Versions
MIT
License
No
Install Scripts
Verified
Provenance

Supply chain provenance

Status for the latest visible version.

SLSA provenance attestation npm registry signatures gitHead linked

Maintainers

alexfigliolia

Keywords

ciclicritical-pathfrontendperformancerust

Accepted risks

Findings the reviewer chose to accept rather than block on.

SourceRuleReasonAccepted byWhen
npm-metadata bundled-binaries AI (npm-metadata): Platform-specific .node binary is the package's sole purpose; SLSA provenance attestation confirms CI/CD build integrity. ai
bogus-package bogus-package AI (bogus-package): Platform-specific sub-package pattern; no deps, sparse README, and inflated semver are expected for this type of optional dependency package. ai

Versions (showing 5 of 5)

Version Deps Published
2.0.0 0 / 0
1.2.1 0 / 0
1.2.0 0 / 0
1.1.5 0 / 0
1.1.4 0 / 0

v2.0.0

1 finding
INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.2.1

1 finding
INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.2.0

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-x64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.1.5

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-x64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.1.4

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-x64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.