← Home

@ui-perf/critical-path-darwin-arm64

A critical path assertion library powered by rust

5
Versions
MIT
License
No
Install Scripts
Verified
Provenance

Supply chain provenance

Status for the latest visible version.

SLSA provenance attestation npm registry signatures gitHead linked

Maintainers

alexfigliolia

Keywords

ciclicritical-pathfrontendperformancerust

Accepted risks

Findings the reviewer chose to accept rather than block on.

SourceRuleReasonAccepted byWhen
npm-metadata bundled-binaries AI (npm-metadata): Platform-specific .node addon for a Rust native binding; binary is the package's sole deliverable, backed by SLSA provenance. ai
bogus-package bogus-package AI (bogus-package): Optional platform sub-package; no deps and minimal README are expected for this pattern. ai

Versions (showing 5 of 5)

Version Deps Published
2.0.0 0 / 0
1.2.1 0 / 0
1.2.0 0 / 0
1.1.5 0 / 0
1.1.4 0 / 0

v2.0.0

1 finding
INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.2.1

1 finding
INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.2.0

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-arm64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.1.5

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-arm64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.

v1.1.4

2 findings
HIGH Bundled binary files (1) npm-metadata

Package contains compiled binaries that could be backdoors: • critical-path.darwin-arm64.node

INFO Has SLSA provenance attestation provenance

Published via CI/CD with Sigstore attestation (predicate: https://slsa.dev/provenance/v1). This is the strongest supply chain integrity signal.